K-12

  • Location: Brighton, Colorado
  • A new 2-story 56,910 square foot charter school with a 600 student capacity. The scope of work included electrical design for a full service kitchen serving a 200 seat cafeteria. The kitchen included a walk-in refrigerators and freezers, heated and cooled merchandisers, an industrial dishwasher with disposer, ..

  • Location: Aurora, Colorado
  • Electrical engineering design for a remodel of a 3-story 60,000 square foot elementary school building on an existing school site. The building included an entrance and lobby, group restrooms, classrooms, gymnasium, kitchen, and support areas...

  • Location: Broomfield, Colorado
  • New 66,000 square foot addition and renovation to include classrooms and physics lab. A new classroom and physics lab addition/renovation to the existing school. The new building addition is estimated to be approximately 66,000 square feet. The project also includes some renovation work to the electrical syste..

  • Location: Yoder, CO
  • Through the Colorado Department of Education’s BEST GRANT program, Edison School Districted contracted MEP Engineering to design the mechanical, electrical and plumbing systems for a new single story Elementary school building in 2007. The new building is approximately 13,447 square feet and includes cla..

  • Location: Arvada, Colorado
  • The project included the demolition and renovation of an existing single story elementary school on an existing school site within the jurisdiction of Jeffco Public Schools. The overall building square footage was 49,700 square feet with 35,200 square feet of core building space, 3,100 square feet of a north w..